Defect liability period (DLP)

A defect liability period is the interval following practical completion or handover during which the developer or contractor remains contractually responsible for remedying defects that appear. In UAE property it is commonly twelve months, though structural warranties often run considerably longer.

Why the clock matters

The obligation is time-bound. A defect identified inside the window is the developer’s to fix; the same defect identified a month later is frequently the owner’s. That makes the expiry date one of the more financially consequential dates a property carries.

For an operator taking on several buildings from several developers, each with its own completion date, the periods do not align — which is exactly why they get missed.

Running it well

Track the period per property from completion, keep the snagging list open against it rather than closing it at handover, and inspect deliberately before expiry rather than waiting for defects to be reported. The last inspection before the window closes is usually the most valuable one.

Related terms

Snagging · Occupancy certificate · Owners association